The second la Boite box is pushing forward for the final few days of work before permitting and setting it up on site. Plumbing has gone in, cabinets and fridges, have been set, and the folding window wall has been glazed. All that's left on the insides of the trailer are the setting of the sinks, final electrical trim-out, mini-split AC install, and various minor trim bits. Masking off of logos and exterior paint are up soon after!
This article saved me a lot of time with research. Very well thought out. Now if only I get an A. If I do next one is on me!
Posted by: Samantha | September 26, 2011 at 02:22 PM