Lots of finishing touches are happening at the sushiBOX in preperation for opening.
The steel framed upper decks that attach to the trailer have been all decked out. The lower platform and step just sit on the ground and can be moved about if need be.
The final electrical whip was hooked up to the trailer and plugged into the subpanel. The vinyl logo has gone on as well.
All that is left is final consult and kitchen set-up with the chef, final paint touch-ups and some additional landscaping and they should be good to go.
Awesome! Can't wait to be in Austin in a couple of weeks and see it. Where is this destined to be parked? Maybe we can meet and talk shop.
Posted by: john walker | January 06, 2011 at 05:26 PM
It's currently sitting at 2nd and Congress and should be there until the lots get re-developed, and who knows when that may be...
Posted by: Mark Meyer | January 06, 2011 at 07:24 PM